Lifting Gear and Scissor Lift Rescue: Why Improvement Notices Fail at Follow-Up

WorkSafe Notices & Inspections // Follow-up readiness
Lifting gear and scissor lift rescue: why improvement notices fail at follow-up

Most improvement notices that fail at follow-up do not fail for lack of effort. They fail because the work stopped at the paperwork.

Two notice topics show this more clearly than most: lifting gear, and emergency procedures for work at height. Both come up often for businesses that install, service or maintain equipment from elevating work platforms (EWPs), most often scissor lifts. This is what an inspector looks for at the follow-up visit, the gaps we see most often, and how to close them before your compliance date.

DOC-VIC-IN-007 // REV C
!

An inspector closes a notice on what the crew can do, not on what the folder says. A register with no IDs and an emergency procedure nobody has practised will not get you over the line.

REF-AL-021
01 // The pattern

Started is not finished

At a follow-up visit the inspector works through what the notice asked for and looks for evidence that it is in place and working. Notices that close have three things in common: the document is specific to the actual task, the crew is using it, and someone can show the records. Notices that do not close usually show one of these:

What the inspector findsWhy it does not close the notice
A register set up but not populatedA template with nothing behind it. No items, no IDs, no inspection history.
A procedure nobody has been trained inWritten, not workable. The crew cannot show they can do it.
A generic templateIt describes someone else's work, equipment or site.
Evidence spread across documentsNobody on site can find it or explain it on the day.

If you are earlier in the process, our guide to responding to an improvement notice covers what a notice contains, extensions and internal review.

02 // Lifting gear

The paperwork exists. The system does not.

These gaps are common for businesses that rig loads now and then rather than every day: installers, maintenance contractors and fit-out crews.

01

A register with no IDs is a list

Every sling and shackle needs a unique ID that is tagged on the item and recorded in the register, and the register needs to link to inspection records. Without the ID, nobody can prove which sling was checked. How the ID goes on matters too. Do not write on slings with permanent markers or paint: solvents in some inks and paints can affect synthetic fibres, the writing fades or smears until nobody can read it, and it can cover the manufacturer's label. Use a durable ID tag that does not cover the label, or the manufacturer's own marking method. It looks petty. On high risk work, small habits like this are what an inspector reads as discipline.

02

Storage that damages the gear

Slings thrown in a closed toolbox with bars, PPE and spray cans get no ventilation, are crushed and abraded by tools, and are exposed to chemicals. Synthetic slings need clean, dry, ventilated storage away from chemicals, UV, heat and sharp objects. A breathable sling bag in the vehicle fixes most of this for very little money.

03

No one under a suspended load

Beams and panels slung off a platform with people working beneath or beside them is one of the most common findings on installation work. Nobody goes under or beside a suspended load at any time, with no exceptions. Bring the load into place with everyone clear, land it or hold it on rated support, and only then do installers come in from the side.

04

Is that anchor point rated for it?

A scissor lift's anchor point may not be designed to take a slung load at all. Hired lifts change from job to job, so get written confirmation from the hirer or manufacturer for each model. If slinging is not permitted, use something else, such as the manufacturer's lifting gear, a rated support or a jig.

05

A forklift nudging a hung part is a lift

Using a forklift to push a part that is hanging on a sling is a suspended load lift. Crews often miss this, so it needs to be in the lift plan and in the exclusion zone like any other lift.

06

Inspection intervals people get wrong

No regulation sets a sling inspection interval. The duty comes from s21 of the OHS Act, and the interval comes from the Standard: AS 1353:2026 for flat synthetic webbing slings, which sets a competent person inspection at least every three months, and AS 4497 for round slings. Add a check before every use. AS 1353 was revised in 2026, so check that your procedures refer to the current Standard for each type of gear.

07

Quarantine or discard

If the sling has clearly failed, discard it and make it unusable. If you are in doubt, it is overdue, or it was involved in an incident, quarantine it with a DO NOT USE tag for a competent person to decide. Keep colour codes clean: if your test and tag program uses red for one quarter, red stops meaning do not use.

08

A lift plan, not a habit

Have a licensed dogger or rigger prepare and sign a rigging sheet for each load type. Then make a job lift plan for each job that records the gear and any hired items. Any change on the day goes back to the licensed person.

Inspector lens // REF-IN-031

Expect the inspector to pick up a sling, read the tag, find that ID in your register and ask for its last inspection. If any step in that chain is missing, the register does not count, however tidy the spreadsheet looks.

Same standard, whoever owns the gear

Mixed ownership is where gaps hide. Set one standard that applies whoever owns the equipment:

GearWho maintains itWhat you check
Your own slings and shacklesYouFull regime: on the register, tagged, inspected, pre-use checked.
Hired machines (forklift, jib, scissor lift)HirerMaintenance records, operator's manual and jib rating plate, at hire and every shift.
Hired accessoriesHirerLabel and inspection evidence on receipt.
Client-supplied gearClientUse your own by default. Use client machines only with evidence.
Manufacturer-supplied lifting aidsManufacturerCheck on receipt. Add to your register if you keep them.

Rule for all: labelled WLL // unique ID // current inspection evidence // passes pre-use check // suits the rigging plan

Plain maintenance rules worth writing into the procedure: rinse off acid or alkali with water straight away. Air dry, never heat. Never repair a sling yourself, because only the manufacturer replaces labels, fittings or covers and then proof tests it. If in doubt, take it out. WorkSafe's safety alert on soft sling failures shows how storage and handling damage leads to failure, even within the working load limit. For the wider plant duties, see our plant and equipment compliance hub.

03 // Work at height emergencies

A flow chart is not a rescue plan

A scissor lift is a type of EWP, alongside boom lifts and vertical lifts. WorkSafe's practical guidance for all of them is the Elevating Work Platforms industry standard (Edition 4). It is guidance, not law, but it is what an inspector will measure your system against, and its emergency procedures section was updated in the latest edition. Everything below applies to any EWP, not only scissor lifts.

Who the rule covers is wider than most people think

Regulation 49 of the OHS Regulations 2017 requires emergency procedures before work starts wherever you control a fall risk of more than 2 metres with anything other than eliminating it. Elimination means doing the work on the ground or from solid construction. An EWP is neither. So the duty covers all EWP work above 2 metres, including scissor lifts, not only work where harnesses are worn.

"Immediately" is the test

The procedures must allow a person who has fallen to be rescued and given first aid, and they must be workable immediately after a fall. The risks of the rescue itself must also be controlled: further falls, electric shock, crushing and manual handling.

Where emergency procedures usually fall short

Many businesses have a single flow chart for an arrested fall. These are the problems we see most often:

  • One scenario only. Nothing for a medical episode at height, a lift that will not come down, entrapment or tip-over.
  • Notify the manager comes before rescue.
  • "Call 000 and wait." Waiting for emergency services fails the immediately test. Waiting for 000 is not a rescue plan.
  • Circular references. The procedure points to another document that has no retrieval steps.
  • Outdated first aid advice. Keeping a rescued person seated or squatting. Current ANZCOR guidance (Guideline 9.1.5) is to lay the person down as soon as it is safe to do so.
  • No WorkSafe notification or site preservation step under s38 and s39 of the OHS Act.
  • Saved as an image. It cannot be edited or version controlled.
  • Downloaded templates. Scenarios written for other industries, other equipment or other countries, or rescues that rely on a boom lift or emergency services that are not normally on site. Scenarios must match your actual work, equipment and sites.
01

The ground person is the rescuer

Competency checks often assess the operator on emergency lowering and skip the ground support person, who is the one who will actually do the rescue. WorkSafe's EWP industry standard expects the safety observer to be trained in operating the EWP, and licensed where the type of EWP requires it. Train them on today's lift, and keep them in line of sight every time.

02

Hired lifts change every job

Emergency lowering differs by make and model: bleed valve, hand pump, cable or auxiliary power. The fix is a one-page Lift Emergency Controls Card for every lift delivered, plus familiarisation and a function test of the ground and auxiliary controls before work starts.

03

First aid travels with the crew

Work at height is a higher-risk factor under WorkSafe's first aid compliance code. For mobile crews at customer sites, put at least one qualified first aider in every crew and a kit in the vehicle, and know the AED location and nearest hospital before work starts.

04

Paper before drills

Do not go straight to training scenarios. Write the procedure first, then build the scenarios and drills from it. Otherwise you are training people to follow a procedure that does not exist.

A workable procedure for EWP work covers at least six scenarios, each on a one-page action card:

Card 1Person unwell on the platform
Card 2Lift will not lower
Card 3Person trapped or crushed
Card 4Person suspended in harness
Card 5Lift unstable or struck
Card 6Electrical, fire or site emergency

Back the cards up with a site emergency information sheet, a lift emergency controls card, a drill record and matrix, clear site emergency roles, and a head office checklist.

Inspector lens // REF-IN-032

Procedures must be backed by practical training. At follow-up, expect three questions. Can the crew operate emergency lowering on the lift they have today? Can they get an incapacitated person down? Is a trained person on site? If the answer to any of these is no, the procedure is not finished.

04 // A note on SWMS

Calling it a SWMS does not make it one

Installers often call every task document a SWMS. In Victoria a safe work method statement is a construction document. Under r327 of the OHS Regulations 2017, it is required for high risk construction work, and construction work involving a risk of a fall of more than 2 metres is high risk construction work.

Whether installing or servicing equipment at a customer site counts as construction work depends on the job and on the definition of construction work in the Regulations. Do not assume either way. Work it out for each type of job, because the answer changes what the law requires:

  • If it is high risk construction work: a SWMS must be prepared before the work starts, the work must follow it, and the work stops if it does not.
  • If it is not construction work: there is no SWMS duty. You still need a documented safe system of work under s21 of the OHS Act, such as a safe work procedure or job safety analysis, and the emergency procedures under r49 still apply to EWP work.

The label is not what an inspector tests. A task document called a SWMS that does not match the work fails the same way as any other. What matters is that the document fits the job, sets out the controls, and is used on site.

05 // Getting ready for follow-up

Work from the inspector's list

The notice, and anything the inspector said or wrote at the visit, tells you what they need to see. Build your response around that list, one item at a time.

01

Split the actions

Put everything in two groups: "before the compliance date" and "can follow". Spend the time you have left on the first group.

02

Four parts per item

For each item: the gap, the procedure wording, the action, and the evidence you will show the inspector. If you cannot name the evidence, the item is not closed.

03

Do not rewrite what was accepted

If the inspector has already accepted part of your system, leave it alone. Where it conflicts with manufacturer instructions, deal with that as a risk and verification item, not a rewrite.

04

Train before the visit

Drills and training are what the inspector will test. If you need an extension, use the time to get the crew competent, not only to finish the documents.

The same principle runs through our psychosocial improvement notice case study: compliance an inspector cannot see on the day does not count. For record-keeping on the plant side, see plant maintenance records and WorkSafe notices.

06 // Legal stack

What sits behind these notices

Layer 01

OHS Act 2004 s21

The employer's general duty to provide and maintain safe plant and systems of work. This is where the sling inspection obligation comes from, because no regulation sets the interval.

Layer 02

OHS Regulations 2017 Part 3.3, r44 and r49

The falls hierarchy of control, and emergency procedures for rescue and first aid that must be in place before work starts, workable immediately after a fall, with the risks of the rescue itself controlled.

Layer 03

OHS Regulations 2017 r327

A SWMS is required before high risk construction work starts, and the work must follow it. This applies only where the work is construction work.

Layer 04

OHS Act 2004 s38 and s39

Notifying WorkSafe of an incident and preserving the site. Both belong in the emergency procedure, not in a separate document nobody opens.

Layer 05

WorkSafe guidance

Elevating Work Platforms industry standard (Edition 4), and the compliance codes for First aid in the workplace and Plant. Practical guidance on how to meet the duties above.

Layer 06

AS 1353:2026, AS 4497 and ANZCOR 9.1.5

Australian Standards for flat synthetic webbing slings and round slings, and the ANZCOR first aid guideline for harness suspension: send for an ambulance, rescue the person and lay them down as soon as it is safe to do so.

07 // Check your own system

Two quick checklists

Lifting gear

  • Every sling and shackle tagged with a unique ID and on the register
  • No permanent marker or paint on slings, and manufacturer labels left clear and legible
  • Pre-use check every time, and a competent person inspection at least every three months for synthetic slings
  • Stored clean, dry and ventilated, away from tools and chemicals
  • A rigging sheet for each load type and a lift plan for each job
  • Written confirmation before rigging off any hired machine
  • Clear quarantine and discard rules, with red reserved for do not use

Work at height emergencies

  • Covers medical episode, lift will not lower, entrapment, harness suspension, tip-over and electrical contact
  • Rescue possible immediately with what is on site
  • Emergency controls card and function test for every lift delivered
  • Trained ground support person in line of sight, every time
  • A first aider in every crew
  • Drills recorded, and the procedure reviewed after drills and changes
  • WorkSafe notification and site preservation steps included
08 // Common questions

Questions employers ask

Does regulation 49 apply to scissor lift and other EWP work if nobody is wearing a harness?

Yes. Regulation 49 applies wherever a fall risk of more than 2 metres is controlled by anything other than elimination, meaning work on the ground or from solid construction. An EWP, including a scissor lift, is neither, so emergency procedures are needed for all EWP work above 2 metres. A medical episode on the platform or a lift that will not lower are just as likely as an arrested fall.

Is "call 000" enough as a work at height rescue plan?

No. The procedures must be workable immediately after a fall. Emergency services cannot get there immediately, and they may not have the equipment to reach your platform. You need a rescue the crew can carry out with what is on site, and you call 000 at the same time, not instead.

Do I need a SWMS for installing equipment from a scissor lift or other EWP?

Only if the work is high risk construction work. Construction work with a risk of a fall of more than 2 metres is high risk construction work, and r327 then requires a SWMS before work starts. If the job is not construction work, there is no SWMS duty, but you still need a documented safe system of work under s21 and emergency procedures under r49.

How often do synthetic slings need to be inspected in Victoria?

No regulation sets the interval. The duty to maintain plant comes from s21 of the OHS Act, and the interval comes from the Standard. AS 1353:2026 sets a competent person inspection for flat synthetic webbing slings at least every three months, and AS 4497 covers round slings. Check before every use, and inspect more often where the gear works hard or in harsh conditions.

Can I sling a load off a scissor lift?

Only if the manufacturer confirms that the anchor point and the machine are designed for it. Check the operator's manual and get written confirmation from the hirer or manufacturer for each model, because hired lifts change from job to job. If it is not permitted, use the manufacturer's lifting gear, a rated support or a jig instead.

Who is responsible for hired lifting gear?

The hirer maintains the gear, but you are still responsible for the system of work that uses it. Check the label, working load limit and inspection evidence when it arrives. For hired machines, check the records, the manual and the rating plate at hire and at the start of every shift.

Should a person rescued from harness suspension be kept sitting up?

No. That advice is outdated. ANZCOR Guideline 9.1.5 says to send for an ambulance and to rescue the person and lay them down as soon as it is safe to do so. If your procedure still says seated or squatting, update it and retrain your crew.

What if we will not be ready by the compliance date?

Ask for an extension before the date. Show what has been completed and what is left, with realistic timeframes. Our improvement notice guide explains extensions and internal review. Use the extra time to get the crew trained, not only to finish the documents, because training is what the inspector will test.

Compliance date coming up

Got an improvement notice still open?

Send it through. We will review your documents against each item on the notice and give you wording ready to copy, plus a clear list of the evidence the inspector will expect to see, before your compliance date.

Book a 30-minute discussion
or email info@ras-ohs.com.au
RAS-OHSDOC-VIC-IN-007 // WORKSAFE NOTICES & INSPECTIONS
Next
Next

Outgrowing Your Warehouse: The OHS Thresholds Growth Crosses